PO to dock, in 30 days or less.
Dates below are the committed schedule on a repeat run with approved artwork. First runs add 2 to 4 days for hard proofing. You get the tracking reference at trailer seal.
- Day 0PO and print-ready art receivedPrepress starts same day if art lands before 12 PM PT
- Day 1-2Proof approvedPDF proof, then hard proof for litho and rigid
- Day 7-10Physical sample in handShipped DHL from the plant
- Day 10-24Production runPrint, die-cut, glue or hand-assemble, QC
- Day 25Truck loaded at the plantSealed trailer, bonded carrier
- Day 26Border crossing, USMCA entryCertificate of origin filed in advance, duty 0%0.0%
- Day 27-30Delivered to dock or 3PLDirect or transload, appointment scheduledDONE
PO and art in before 12 PM PT
Send print-ready art with the PO and prepress starts the same day. Art that needs rework moves the clock, and we tell you by how much before we touch it.
Proofing
PDF proof for every job. Litho and rigid work gets a hard proof pulled on the production stock. You approve in writing; nothing prints on a verbal.
Physical sample
A physical sample ships DHL from the plant and is in your hands in 7 to 10 days, not 3 weeks.
Production
Print, die-cut, glue or hand-assemble, and QC at the plant that runs your category. Your account manager sends run photos at makeready and at completion.
Seal and cross
Sealed trailer on a bonded carrier to the border. The USMCA certificate of origin is filed before the trailer leaves the yard, so the entry clears with duty at 0.0 percent.
Delivery
Direct to your dock or transloaded to a domestic carrier, appointment scheduled in advance. You hold the tracking reference from trailer seal onward.
Samples on request. You pay the shipping.
Ask for samples with your RFQ and we send current production work in your categories: boxes, cartons, tissue, mailers or dust bags, plus substrate and finish swatches. The samples are free; you cover the DHL shipping. They land in 7 to 10 days.
- COST
- Free, shipping at cost
- SHIPS
- DHL, 7-10 days
- HOW
- Ask with your RFQ

First runs add 2 to 4 days.
The first run of a new SKU carries hard proofing and a dieline check that repeats do not. Plan the top of the range on a first PO; repeats run 14 to 30 days door to door.
Send the spec. Quote back in 2 business days.
Attach a drawing, a dieline, or last year's invoice and we quote against the exact same spec so the comparison is honest. No drawing yet: describe the box and we will draw it.
Request a quote- QUOTE SLA
- 2 business days
- SAMPLES
- 7-10 days, shipped DHL
- HOURS
- 07:00-19:00 CT, Mon-Fri
- DIRECT
- admin@timberlinebrands.com